PART 1

A blast from the past bathroom about to be an updated wonder. Let's get started. Check out these before images!

 

PART 2

The demo has begun! peeling away the yellow square tiles and removing shower, sink and toilet. Stripping the room to prepare fot its update. is done and the new layout is awesome!

 

PART 3

Took down the wall that divided the sink from shower. The shower has been framed out, drywall is up and the shower base concrete it done. The Red Guard has been applied for water proofing.

 

PART 4

The tile has begun! We are using a glass subway tile in blue for the shower wall.

Floor layout is a porcelain plank.

 

PART 5

The tiling is complete and ready to be grouted. Marble sills and seat have been installed.

 

PART 6

Now that we are all grouted, getting ready for all of the finishing pieces! Trim, shower doors, vanity, faucets!

 

PART 7

And we are ready for glass enclosure!

 

PART 8

The final look! a before and after image just to remind you of the transformation.

 